Others

S.N. Project Name Location Client Date Work Accomplished
1 Soil Investigation for Preparatory survey on the project for improvement of aviation safety facilities in major airport, Chandragadi, Janakpur, Dhangadi Jhapa/ Dhansua/Dhangadi JICA/CEMAT 5/1/2015
6/1/2015
In situ and laboratory testing for geotechnical and engineering parameters along the runway of the respective airports
2 Air Transports Capacity Enhancement Project Tribhuvan International Airport Kathmandu JICA/San Jose 11/1/2014
1/1/2015
DTH drilling for grout filling of the earlier drainage system as a part of airport extension project
3 Nepal India Regional Trade and Transport Project Detailed Subsurface Investigation Birgunj and Bhairahawa Nepal India regional trade and transport Project (NIRTTP) 10/1/2014
12/1/2014
Soil and insitu testing and determination of geotechnical parameters for the proposed dry port
4 Detailed sub-surface investigation for Sanitary Landfill site, Idiyahi and Bishrampur VDC in Bara district and Sewerage treatment plant site, Ward No 1, Birgunj Sub-Metropolitant City Bara, Birgunj Birjung Sub-Metropolitan City 3/1/2013
4/1/2013
Drilling and soil testing of sewage treatment plant and land fill site, installation of stand pipe for peizomenter, test pitting, sampling and laboratory testing for geotechnical and engineering parameters
5 Australian Embassy Building Construction Kathmandu Australian Embassy 12/1/2007
2/1/2008
Soil investigation laboratory testing for geotechnical paramaters for foundation design
6 New Royal Norwegian Embassy Chancellery Building Iconstruction Kathmandu Norwegian Embassy 1/1/2006
3/1/2006
Soil investigation laboratory testing for geotechnical paramaters for foundation design
7 Bulk Distribution Mains of Melamchi Water Supply Development Project Kathmandu Valley Lahmeyer International / Mott Mac Donald Ltd/ MWSD and Association with Nepal Electricity Authority (NEA) 11/1/1999
2/1/2000
Site investigation (geology) and drilling works

Special Works

S.N. Project Name Location Client Date Work Accomplished
1 Horizontal drilling for soil nailing along Mugling-Narayanghat Highway, CH 26+025 Bhaludhunga, Chitwan Karnali-Tech Pvt. Ltd 10/1/2021
1/1/2022
DTH drilling, grouting and insertion of horizontal drainage pipe
2 Mai Khola Hydroelectric Project Illam Panchakanya Mai Hydroeoectric Project 4/1/2021
6/1/2021
DTH drilling, grouting and insertion of horizontal drainage pipe
3 Insertation of Horizontal Sub surface drainage at Dhulikhel-Sindhuli road Kavreplanchowk JICA Nepal 6/1/2015
7/1/2015
DTH drilling and installation of subsurface horizontal drainage (total of 2604.00m of linear depth, max. 50.00m)
4 Landslide Control for Bardibas-Sindhuli Bazar Road Section, Station 29+300 Sindhuli JICA Nepal 10/1/2013
3/1/2014
DTH drilling and installation of subsurface horizontal drainage (total of 2604.00m of linear depth, max. 50.00m)
5 Kulekhani III Hydro Electric Project, Plate load test at Power house Suntar, Makawanpur NEA 10/1/2012
10/1/2012
Plate load test for foundation of power generating unit

Mining Sector

S.N. Project Name Location Client Date Work Accomplished
1 Dhaubadi Iron Mines Project Dhaubadi, Nawalparisi Department of Mines and Geology, Dhaubadi Iron Company Limited 12/1/2020
2/1/2022
Exploratory core drilling vertical and inclined (a total of 1056m, maximum depth 286.00m), chemical and geomechanical tests, optical borehole logging
2 Tal Dhunga Limestone(mine) Quarry Project Kavbhrepalnchok – Bagmati Nepal Vector Group Pvt. Ltd 10/1/2018
3/1/2019
Exploratory core drilling vertical and inclined, reserve estimation, sampling and laboratory testing
3 Geotechnical investigation Drilling for Limestone quarry site at Malta Bagmati Gaun Palike Laxmi Cement Udhyog Pvt. Ltd. 5/1/2017
11/1/2017
Exploratory core drilling vertical and inclined, reserve estimation, sampling and laboratory testing
4 Drilling work for Subhashree Agni Cement at quarry site Pyuthan Subhashree Agni Cement Udhyog Pvt. Ltd. 6/1/2015
9/1/2015
Exploratory core drilling vertical and inclined, reserve estimation, sampling and laboratory testing

Transportation Section

S.N Project Name Location Client Date Work Accomplished
1 Posta Bahadur Tunnel (Bhimphadi – Kulekhani Tunnel) Project Makawanpur MoPID, Privince No 3 3/1/2020
6/1/2020
Engineering geological mapping, exploratory drilling with in situ testing, sampling and laboratory testing for geomechanical properties
2 Geotechnical investigation and landslide stabilization works in Narayanghat-Mugling Road Chitwan DoR, Development Cooperation implementaion division 2/1/2019
7/1/2019
DTH drilling and grouting, 67 drill hole each
3 Nagdhunga Tunnel Construction Project Nagdhunga 5/1/2017
12/1/2017
Exploratory core drilling (a total of 605.00m, max depth 185.00m) with in situ testing, ultrasound test of core, laboratory testing for construction material, geophysical investigation (ERT, SRT, MAM, MASW)
4 Raod Sector Development Project, Phase I: Feasibility study and detail engineering design Nepal Department of Roads 5/1/2010
11/1/2015
DCP test, pitting and laboratory testing and analysis
5 Geotechnical investigation of 5 bridges along Gorkha-Barpak Road Gorkha Joint Venture of Oriental Consultants Global Co., Ltd. Pacific Consultants Co., Ltd. MOHRI, Architect & Associates, Inc.CTI Engineering International Co., Ltd. PASCO Corporation 9/1/2015
12/1/2015
Exploratory drilling and insitu testing for bearing capacity and permeability, maximum drill depth up to 20.00m
6 Geotechnical Investigation of Bridge Over Likhu Khola Ramechhap-Solukhumbu Green Venture (P) Ltd. 7/1/2010
7/1/2010
Exploratory drilling and insitu testing for bearing capacity and permeability, maximum drill depth up to 20.00m
7 North-South Fast Track Road Projecxt (TA 4842 NEP) Makawanpur Oriental Consultants Co. Ltd; Japan 11/1/2007
4/1/2008
Exploratory core drilling and insitu testing for bearing capcity and permeability, maximum drill depth up to 20.00m
8 Narayanghat – Mugling Road Rehabilitation Project Narayanghat – Mugling Department of Road 3/1/2005
6/1/2005
Exploratory core drilling and insitu testing for bearing capcity and permeability, maximum drill depth up to 20.00m
9 Shali Nadi Rehabilitation Project Kathmandu DWIDP/DMSP-FU/JICA 11/1/2004
12/1/2004
Exploratory core drilling and insitu testing for bearing capcity and permeability, maximum drill depth up to 20.00m
10 Road Network Development Project – (RNDP) Nepal Department of Road/ Asian Development Bank (ADB) 8/1/2003
4/1/2004
Exploratory core drilling and insitu testing for bearing capcity and permeability, maximum drill depth up to 20.00m
11 Thopal Khola Bridge Project Thopal Khola, Dhadhing Department of Road/ DSD Dillinger Stanhlbau, Gmbh, Germany 10/1/1999
11/1/1999
Exploratory core drilling and insitu testing for bearing capcity and permeability, maximum drill depth up to 20.00m
12 Road Maintenance Development Program – 500km (RMDP) Surkhet – Jumla, Chameliya – Darchula, Safebagar – Martadi, Safebagar – Mangalsen, Gorusinghe – Sandhikharka, Chhinchu – Jajarkot, Kalikot – Jumla, Dharapani -c chhedegad, Surkhet – Kalikot Department of Road/World Bank 12/1/1998
4/1/2005
Insitu testing (DCPT), test pitting sampling and laboratory testing

Hydropower Sector

S.N Project Name Location Client Date Work Accomplished
1 Betan Karnali Electric Project (688 MW) Acham District NEAEC 11/1/2018 7/1/2020 Exploratory core drilling (a total of 744.00m, max depth 120.00m)
2 Kimathanka Arun Electric Project (450MW) Sankhuwashaba District NEAEC 6/1/2018 1/1/2021 Exploratory core drilling vertical and inclined, geological and engineering geological mapping, construction material survey, laboratory testing and analysis. (total 1525m, max 180.00m)
3 Super Tamor Hydroelectric Project (155MW) Taplejung District Crystal Power Development Pvt. Ltd. 4/1/2018 11/1/2019 Exploratory drilling, geological and engineering geolocical mapping construction material survey and laboratory test and analysis
4 400 kV Double Circuit Transmission Line Project Eastern and Central Nepal Stantec Inc., USA 1/1/2019 8/1/2019 Geological and enginnering geological mapping, drilling and testing at substation and transmission tower, geophysical investigation (ERT and SP)
5 Grid Solar and Energy Project Battar, Trishuli RISEN Energy Co. Ltd. 9/1/2018 7/1/2019 Ground improvement, soil testing, laboraoty testing and anlaysis
6 Solu Khola Dudhkoshi HEP (86MW) Solukhumbu Hydro Venture Pvt. Ltd. 5/1/2016 11/1/2016 Exploratory drilling, geological and engineering geolocical mappind construction material survey and laboratory test and analysis
7 Rasuwagadi HEP (111 MW) Rasuwa China International water and Electric Corp. 5/1/2016 8/1/2016 Exploratory drilling (total of 168.00m linear depth, max 64.00m)
8 Solu Khola Dudh Koshi Hydroelectric Project (86MW) Solukhumbu Hydro Venture Pvt. Ltd. 3/1/2013 9/1/2013 Exploratory drilling, geological and engineering geolocical mapping construction material survey and laboratory test and analysis
9 Super Trishuli Hydroelectric Project (80MW) Chitwan / Gorkha Blue Energy Pvt. Ltd 9/1/2014 11/1/2014 Exploratory drilling, geological and engineering geolocical mapping, construction material survey and laboratory test and slope stability analysis
10 Lapchi Hydroelectric Project (160MW) Dolakha NASA Hydropower (P) Ltd. 5/1/2012 8/1/2012 Feasibiligy study, Geological mapping
11 Tamakoshi I Hydroelectric Project (100MW) Ramechhap Satyam Urja Pvt. Ltdl 6/1/2011 9/1/2011 Exploratory drilling
12 Likhu IV Hydroelectric Projects (120MW) Okhaldhunga Green Venture (P) Ltd 3/1/2011 7/1/2011 Geological and geotechnical investigation drilling works at headworks, surge tank and power house site
13 Lower Solu Hydropower Project (82 MW) Solukhumbu Essel-Clean Solu Hydropower Pvt. Ltd. 12/1/2010 5/1/2011 Exploratory drilling, Geological and enfgineering geological mapping, construction material survey, Laboratory testing and analysis
14 Likhu 1 Hydroelectric Project (77 MW) Solukhumbu Pan Himalayan Energy (P) Ltd. 11/1/2009 7/1/2010 Exploratory drilling, Geological and engineering geological mapping, construction material survey, Laboratory testing and analysis
15 Likhu 2 Hydroelectric Project (55 MW) Solukhumbu 11/1/2009 7/1/2010 Exploratory drilling, Geological and engineering geological mapping, construction material survey, Laboratory testing and analysis
16 Likhu A Hydroelectric Project (51 MW) Solukhumbu Numbur Himalay Hydropower (P) Ltd. 11/1/2009 7/1/2010 Exploratory drilling, Geological and engineering geological mapping, construction material survey, Laboratory testing and analysis
17 Upper Karnali Hydroelectric Project (900 MW) Dailekh – Achham GMR 12/1/2008 12/1/2009 Exploratory core drilling, in situ testing,derivation of soil/rock engineering properties